PMP 2026 — Practice Paper 1 (Mixed)

Question 1 of 25

1 At Aurora FinTech, two developers on a Scrum team openly disagree during the daily standup about whether to refactor a payments module now or defer it to a later sprint, and the tension is spilling into sprint planning. The Scrum Master notices the wider team disengaging. What should the Scrum Master do FIRST?
2 Crestfield Retail Group has formed a new cross-functional agile team to build an omnichannel checkout. Three weeks in, members are challenging each other's ideas, roles feel unclear, and velocity is erratic. Which action by the team lead is MOST appropriate at this stage?
3 On NexaBuild Construction's predictive highway-bridge project, a newly elected council member has begun publicly questioning the project's traffic disruption. The PM had classified this stakeholder as low-interest during planning. What should the PM do FIRST?
4 Aquila Aerospace's predictive radar program adds four new engineers to a team that previously had six members, all of whom must communicate directly with one another. Approximately how many additional communication channels does this create, and what should the PM do about it?
5 At Iridia EdTech, the lead architect who designed the adaptive-learning engine has given three weeks' notice, and much of the design rationale lives only in her head. The PM wants to protect the project from the knowledge loss. Which approach is MOST effective?
6 Verdanix Health Systems runs a hybrid program to modernize a hospital records platform: fixed regulatory milestones with iterative delivery inside each phase. Halfway through, members from different squads describe the program's goal in conflicting ways during a review. What should the PM do FIRST?
7 Verdana Consumer Goods is launching a product via an agile team. The marketing director expects a fixed launch date, while the Product Owner is prioritizing a minimum viable feature set that may exclude a feature marketing has promised to retailers. Which TWO actions should the PM take to align expectations? — select TWO.
8 On Marwood Government Services' predictive case-management rollout, the client's operations director keeps requesting weekly demos of features that are not yet baselined, raising the team's expectations of early delivery. The PM wants to keep expectations realistic. What should the PM do?
9 On Hartfield Energy's predictive substation project, at month 8 the planned value (PV) is £4.0m, earned value (EV) is £3.4m, and actual cost (AC) is £4.0m. The sponsor asks whether the project is performing well. What do the metrics indicate?
10 Polaris Mining Co.'s predictive processing-plant project has fallen two weeks behind on the critical path, and the completion milestone is contractually fixed. Adding cost is acceptable; increasing risk from overlapping dependent activities is not. Which schedule-compression technique should the PM choose?
11 Elmbrook Pharma's predictive plant-upgrade project is deciding how much to invest in early inspection and supplier qualification. Leadership questions the spend given tight budgets. Applying cost-of-quality (CoQ) thinking, how should the PM justify the investment?
12 Kalahari Logistics is procuring a bespoke warehouse-automation system where the core requirements are well defined but some integration work is uncertain. The PM wants to control cost risk while fairly compensating the vendor for the uncertain scope. Which TWO actions are MOST appropriate? — select TWO.
13 Crestfield Retail Group's agile team can deliver either a loyalty feature that early data suggests will lift repeat purchases, or a back-office reporting feature the finance team has requested for later. The release can include only one this sprint. How should the Product Owner and PM decide?
14 A new sustainability-disclosure regulation will require Kalahari Logistics to report supply-chain emissions data that its current predictive project was not scoped to collect. The PM learns of this mid-execution. What should the PM do FIRST?
15 During Verdanix Health Systems' predictive records-migration project, a security assessment reveals that a supplier's data-transfer method could expose patient records if a specific vulnerability is exploited. No breach has occurred yet. How should the PM handle this in the risk process?
16 A NexaBuild Construction client verbally asks the site PM to add a drainage upgrade to the predictive project, promising to 'sort out the paperwork later.' The change would affect cost and schedule. What should the PM do?
17 Aurora FinTech's agile team is midway through building a lending product when a regulator announces new affordability-check rules taking effect in four months. What should the PM and Product Owner do FIRST?
18 Iridia EdTech's agile team reports that a slow third-party API and an unavailable test environment are blocking two user stories from completing. As the impediments are raised in the standup, which TWO actions should the Scrum Master take? — select TWO.
19 Marwood Government Services is establishing governance for a new agile delivery program that must satisfy public-sector oversight while preserving team agility. Which TWO elements should the PM ensure the governance framework defines? — select TWO.
20 Verdana Consumer Goods pilots an AI tool that forecasts sprint risks from historical delivery data. In one sprint the tool flags a supplier as 'high risk,' but the team suspects the model is biased by outdated data. How should the PM use the AI output?

Case 1: Hartfield Energy — Solar Farm Program

Hartfield Energy plc is delivering a 200 MW solar farm in southern Spain using a hybrid approach: predictive top-level milestones (regulatory approvals, grid connection, commissioning) with agile delivery inside each phase. The program manager, Diane Okonjo, leads about 45 people split across three Scrum teams plus a regulatory workstream.

At the end of Sprint 8 (month 6 of 24), the program dashboard shows:

  • CPI 0.82 · SPI 1.05
  • Sprint velocity has fallen roughly 30% over the last three sprints
  • The grid-connection regulatory milestone is at risk because of a new Spanish sustainability-disclosure requirement (CSRD-aligned)
  • Two senior engineers resigned last month, taking key design knowledge with them
  • The sponsor wants weekly executive reporting to start next week

Diane is preparing for the upcoming program steering committee and must decide how to frame the situation and what to recommend.

21 What should Diane do FIRST as she prepares for the steering committee?

Case 1: Hartfield Energy — Solar Farm Program

Hartfield Energy plc is delivering a 200 MW solar farm in southern Spain using a hybrid approach: predictive top-level milestones (regulatory approvals, grid connection, commissioning) with agile delivery inside each phase. The program manager, Diane Okonjo, leads about 45 people split across three Scrum teams plus a regulatory workstream.

At the end of Sprint 8 (month 6 of 24), the program dashboard shows:

  • CPI 0.82 · SPI 1.05
  • Sprint velocity has fallen roughly 30% over the last three sprints
  • The grid-connection regulatory milestone is at risk because of a new Spanish sustainability-disclosure requirement (CSRD-aligned)
  • Two senior engineers resigned last month, taking key design knowledge with them
  • The sponsor wants weekly executive reporting to start next week

Diane is preparing for the upcoming program steering committee and must decide how to frame the situation and what to recommend.

22 Considering the dashboard, which issue is MOST critical for Diane to address to protect continued business value?

Case 1: Hartfield Energy — Solar Farm Program

Hartfield Energy plc is delivering a 200 MW solar farm in southern Spain using a hybrid approach: predictive top-level milestones (regulatory approvals, grid connection, commissioning) with agile delivery inside each phase. The program manager, Diane Okonjo, leads about 45 people split across three Scrum teams plus a regulatory workstream.

At the end of Sprint 8 (month 6 of 24), the program dashboard shows:

  • CPI 0.82 · SPI 1.05
  • Sprint velocity has fallen roughly 30% over the last three sprints
  • The grid-connection regulatory milestone is at risk because of a new Spanish sustainability-disclosure requirement (CSRD-aligned)
  • Two senior engineers resigned last month, taking key design knowledge with them
  • The sponsor wants weekly executive reporting to start next week

Diane is preparing for the upcoming program steering committee and must decide how to frame the situation and what to recommend.

23 As Diane plans next steps with the affected Scrum team, which TWO actions are MOST appropriate? — select TWO.

Case 1: Hartfield Energy — Solar Farm Program

Hartfield Energy plc is delivering a 200 MW solar farm in southern Spain using a hybrid approach: predictive top-level milestones (regulatory approvals, grid connection, commissioning) with agile delivery inside each phase. The program manager, Diane Okonjo, leads about 45 people split across three Scrum teams plus a regulatory workstream.

At the end of Sprint 8 (month 6 of 24), the program dashboard shows:

  • CPI 0.82 · SPI 1.05
  • Sprint velocity has fallen roughly 30% over the last three sprints
  • The grid-connection regulatory milestone is at risk because of a new Spanish sustainability-disclosure requirement (CSRD-aligned)
  • Two senior engineers resigned last month, taking key design knowledge with them
  • The sponsor wants weekly executive reporting to start next week

Diane is preparing for the upcoming program steering committee and must decide how to frame the situation and what to recommend.

24 Two weeks later, the regulatory workstream confirms the grid-connection milestone will slip by six weeks unless additional compliance work is funded now. That milestone is contractual. What should Diane recommend to the steering committee?

Case 1: Hartfield Energy — Solar Farm Program

Hartfield Energy plc is delivering a 200 MW solar farm in southern Spain using a hybrid approach: predictive top-level milestones (regulatory approvals, grid connection, commissioning) with agile delivery inside each phase. The program manager, Diane Okonjo, leads about 45 people split across three Scrum teams plus a regulatory workstream.

At the end of Sprint 8 (month 6 of 24), the program dashboard shows:

  • CPI 0.82 · SPI 1.05
  • Sprint velocity has fallen roughly 30% over the last three sprints
  • The grid-connection regulatory milestone is at risk because of a new Spanish sustainability-disclosure requirement (CSRD-aligned)
  • Two senior engineers resigned last month, taking key design knowledge with them
  • The sponsor wants weekly executive reporting to start next week

Diane is preparing for the upcoming program steering committee and must decide how to frame the situation and what to recommend.

25 Reflecting on the program, which of Diane's practices BEST demonstrates effective hybrid project management in this scenario?